FORMACORE TIMETAL BUILDINGS · WEST TEXAS

Your shop, your house, or both. Built to finish.

Most metal building companies sell you a kit and drive away. We pour the slab, erect the structure, dry it in, and finish the inside — framing, drywall, electrical under our own TECL license, and the finishes you picked. One contract, one company, from bare dirt to move-in.

El Paso, Hudspeth, Otero and Doña Ana counties. Further out, ask.

What it actually costs

Nobody publishes these numbers, which is why every barndominium conversation starts with a month of guessing. Here is the honest shape of it for our market.

Shell only
$45 – $75 / SF
Slab, structure, metal skin and roof, doors and windows, dried in. You finish the inside yourself or later.
Shell plus basic finish-out
$110 – $160 / SF
Everything above, plus insulation, MEP rough and trim, drywall, and builder-grade finishes. Livable, not fancy.
Turnkey custom
$165 – $240 / SF
Selected finishes, custom cabinetry, upgraded fixtures, designed interior. Move in and hang pictures.

Not included, and they are not small

  • Land, and any clearing or grading it needs
  • Septic system or sewer tap, and the permit for it
  • Water well or utility water tap
  • Power drop from the utility to the building
  • Driveway and culvert
  • Engineering, plan review and county permit fees

Read the range honestly

These are planning ranges for El Paso and West Texas, not a bid and not binding. Site conditions move them more than anything else — a flat lot with power at the road prices near the bottom, a sloped lot twelve miles from the nearest transformer prices above the top.

Budget your site costs separately and early. The single most common way these projects fail is a buyer who spends the whole budget on the building and finds out in month four that the power drop costs $30,000.

Four ways people build these

01
Shop only
Working building. Slab, overhead doors, lights and power. No conditioned space.
02
Shop with living quarters
The classic. Workspace up front, conditioned living area behind or above it.
03
Full residence
The whole envelope finished as a house. Metal structure, residential interior.
04
Event and ag barn
Venue, arena or covered storage. Restrooms and a catering wall if you are renting it out.
05
Finish-out only
Shell already standing. We do everything inside it.
06
Commercial metal
Contractor yards, warehouses and light industrial on the same structural system.

How a build runs

Longer than a tenant buildout and with more that can go sideways before anyone pours concrete. Here is the order it happens in.

1

Land and feasibility

Where is the power, where does the septic go, what does the county require, and does the site drain. This conversation costs nothing and saves the most money.

Before anything
2

Size, layout and budget

Square footage under roof, split between shop and living, finish level. We put a real number against it before you commit to a building order.

1–2 weeks
3

Plans, engineering and permit

Stamped structural for the building, floor plan for the interior, county submittal. Lenders want this package too.

4–10 weeks
4

Site work and slab

Clear, pad, trench utilities, form and pour. Building order placed against the delivery lead time.

3–5 weeks
5

Erect and dry in

Structure up, roof and wall panels on, doors and windows set. From here weather stops mattering.

2–4 weeks
6

Finish-out and move in

Framing, insulation, MEP, drywall, finishes, fixtures. Our own crews, the same ones that finish commercial interiors.

8–16 weeks

Why us instead of a building dealer

  • A dealer sells the kit. We are the contractor who has to make it work on your dirt.
  • Electrical is in house under TECL #41703, not a sub we found last week.
  • Our framing and drywall crews finish commercial interiors to brand standards — that is the same crew finishing your living space.
  • One contract, one schedule, one person answering the phone.

Straight answers

Can you build if I have not bought the land yet?

Talk to us before you buy. Twenty minutes on a parcel can tell you whether the power, water and septic situation will eat your budget. We have no stake in which lot you pick.

Will a bank finance this?

Construction lending for metal-framed homes is tighter than for stick-built, and appraisals in rural counties can come in under cost. Most buyers use a construction-to-permanent loan or a land-and-build package. Have that conversation with your lender before you commit to a size — and expect them to want the stamped plans, the contract and the builder's insurance.

How long does the whole thing take?

Realistically nine to eighteen months from first conversation to move-in, and most of the variance is permitting and building delivery, not construction. Anyone promising six months has not priced your site work yet.

Do you do finish-out only?

Yes, and it is a good chunk of this work. Shell already standing, we do everything inside it.

What size do these usually run?

Most of what we see is 1,800 to 4,000 SF under roof. Below about 1,200 SF the fixed costs make the per-foot number look bad. Above 5,000 SF, ask.

Tell us about your build

Two minutes. You get a written response with a realistic range within one business day.

What are you building?
Where does the land stand?
Finish level you have in mind